Showing 1 - 10 of 53
This paper considers a dynamic lot sizing problem faced by a producer who supplies a single product to multiple customers. Characterized by their backorder costs as well as shipping costs, a customer with a high backorder cost has a greater need for the product than a customer with a low...
Persistent link: https://www.econbiz.de/10014208056
We consider a production planning problem for a general jobshop subject to breakdown and repair of machines and subject to lower and upper bound constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to choose the...
Persistent link: https://www.econbiz.de/10014211280
We present structural and computational investigations of a new class of weak forecast horizons - minimal forecast horizons under the assumption that future demands are integer multiples of a given positive real number - for a specific class of dynamic lot-size (DLS) problems. Apart from being...
Persistent link: https://www.econbiz.de/10012766485
This paper studies multiproduct inventory models with stochastic demands and a warehousing constraint. Finite horizon as well as stationary and nonstationary discounted-cost infinite-horizon problems are addressed. Existence of optimal feedback policies is established under fairly general...
Persistent link: https://www.econbiz.de/10012766626
A single-machine multiproduct manufacturing system with random breakdowns and random repair times is considered. Under a weak capacity condition on the system it is shown that the total work-in-progress (WIP) is a recurrent stochastic process. By replacing the stochastic model by a deterministic...
Persistent link: https://www.econbiz.de/10012746440
In this paper, we consider a production planning problem in a two-machine flowshop subject to breakdown and repair of machines and subject to non-negativity constraints on work-in-process. The machine capacities and demand processes are assumed to be finite state Markov chains. The problem is to...
Persistent link: https://www.econbiz.de/10012746441
This paper considers an infinite horizon stochastic production planning problem with the constraint that production rate must be nonnegative. It is shown that an optimal feedback solution exists for the problem. Moreover, this solution is characterized and is then compared with the solution of...
Persistent link: https://www.econbiz.de/10012746449
A single machine processing different types of parts is considered. Switching from one type to another involves a setup time. The part types may have different processing times. The resulting scheduling problem is treated as a dynamical system for which several feedback policies that are...
Persistent link: https://www.econbiz.de/10012746791
This paper considers an infinite horizon stochastic production planning problem with demand assumed to be a continuous-time Markov chain. The problems with control (production) and state (inventory) constraints are treated. It is shown that a unique optimal feedback solution exists, after first...
Persistent link: https://www.econbiz.de/10012746800
This paper presents an asymptotic analysis of hierarchical marketing-production systems with stochastic demand and stochastic production capacity modelled as finite state Markov processes. The decision variables used are advertising and production rates which influence capacity, demand, and...
Persistent link: https://www.econbiz.de/10012746801