Showing 191 - 200 of 278
This article considers the production planning problem of a shop which can produce in either one shift or two shifts. Setup cost is charged whenever there is an increase in the production rate from one period to the next. Efficient planning horizon procedures have been developed for this model....
Persistent link: https://www.econbiz.de/10014219999
This paper develops a forward algorithm and planning horizon procedures for an important machine replacement model where it is assumed that the technological environment is improving over time and that the machine-in-use can be replaced by any of the several different kinds of machines available...
Persistent link: https://www.econbiz.de/10014220000
We consider the problem of production control in a single machine, single product, unreliable manufacturing system facing a constant demand d. The goal is to minimize the expected average (per unit time) inventory/backlog costs. Under heavy traffic condition, i.e., when the average production...
Persistent link: https://www.econbiz.de/10014220023
Information delays exist when the most recent inventory information available to the inventory manager (IM) is dated; namely, the IM observes only the inventory level of an earlier period. We introduce information delays into the standard multiperiod stochastic inventory problem with backorders....
Persistent link: https://www.econbiz.de/10014220231
We present an approach of hierarchical decision making in production planning and capacity expansion problems under uncertainty. We show that under reasonable assumptions, the strategic level management can base the capacity decision on aggregated information from the shopfloor, and the...
Persistent link: https://www.econbiz.de/10014220232
We are concerned with a discrete-time undiscounted dynamic lot size model in which demand and the production setup cost are constant for an initial few periods and the holding cost of inventory is an arbitrary nondecreasing function assumed to be stationary (i.e., explicitly independent of time)...
Persistent link: https://www.econbiz.de/10014220369
This paper compares several different production control policies in terms of their robustness to random disturbances such as machine failures, demand fluctuations, and system parameter changes. Simulation models based on VLSI wafer fabrication facilities are utilized to test the performance of...
Persistent link: https://www.econbiz.de/10014220372
We present a new paradigm of hierarchical decision making in production planning and capacity expansion problems under uncertainty. We show that under reasonable assumptions, the strategic level management can base the capacity decision on aggregated information from the shop floor, and the...
Persistent link: https://www.econbiz.de/10014220373
We study a single-period two-stage service-constrained supply chain with an information update. The buyer has two procurement opportunities with the second one after observing a market signal, which updates the demand forecast. He also commits to a service level after observing the market...
Persistent link: https://www.econbiz.de/10014220375
Information delays exist when the most recent inventory information available to the Inventory Manager (IM) is dated. Such situations arise when it takes a while to process the demand data, count the inventory, and pass the results to the IM. We show that the optimal total inventory-related cost...
Persistent link: https://www.econbiz.de/10014220376