Showing 1 - 10 of 40
We consider the scheduling problem of cyclic production in a bufferless dual-gripper robot cell processing a family of … identical parts. The objective is to find an optimal sequence of robot moves so as to maximize the long-run average throughput … rate of the cell. While there has been a considerable amount of research dealing with single-gripper robot cells, there are …
Persistent link: https://www.econbiz.de/10012750229
Flexible robotic cells combine the capabilities of robotic flow shops with those of flexible manufacturing systems. In an m-machine flexible cell, each part visits each machine in the same order. However, the m operations can be performed in any order, and each machine can be configured to...
Persistent link: https://www.econbiz.de/10012707633
A robotic cell - manufacturing system widely used in industry - contains two or more robot-served machines … determine the robot move sequence and the sequence in which parts are to be processed so as to maximize the long-run average … problem complexity and solvability. Focusing on a particular class of robot move sequences, we identify all potentially …
Persistent link: https://www.econbiz.de/10014218586
In this paper, we deal with the problem of sequencing parts and robot moves in a robotic cell where the robot is used … types, the problem of scheduling parts for a specific sequence of robot moves in a two machine cell is formulated as a …
Persistent link: https://www.econbiz.de/10014047541
A great deal of work has been done to analyze the problem of robot move sequencing and part scheduling in robotic … of robotic cells are differentiated from one another by certain characteristics, including robot type, robot travel … parts. A cycle is specified by a repeatable sequence of robot moves designed to transfer a set of parts between the machines …
Persistent link: https://www.econbiz.de/10014218350
state space required to analyze this problem and show that cyclic schedules which repeat a fixed sequence of robot moves …
Persistent link: https://www.econbiz.de/10014047846
or more robot-served machines. The robot can have single or dual gripper. The cycle time is the time to produce a part in … sequence of moves performed by the robot. The processing constraints define the cell to be a flowshop. The objective is the … of this paper is to study the problem of scheduling robot moves in dual gripper robot cells functioning in a bufferless …
Persistent link: https://www.econbiz.de/10014046907
objective is to find a cyclic sequence of robot moves that minimizes the long-run average time to produce a part or …, equivalently, maximizes the throughput rate. The robot can be moved in simple cycles that produce one unit or, in more complicated …
Persistent link: https://www.econbiz.de/10014219898
Scheduling methods are proposed for a class of flexible manufacturing systems consisting of machine centers served by a cyclic conveyor. The minimization of finish time is considered as the optimization criterion. An optimal algorithm is proposed for the minimum conveyor speed (S = 1) for a...
Persistent link: https://www.econbiz.de/10012834910
The optimal production control problem of deterministic pull flow lines with multiple part types is considered in this paper. The last machine is assumed to be the bottleneck. The objective is to minimize the total inventory and backlog costs over time. We give an optimal production policy and...
Persistent link: https://www.econbiz.de/10012835295