Showing 1 - 2 of 2
There is a lack of research on flexible job shop scheduling problem (FJSP) considering limited fixture-pallet resources in multi-product mixed manufacturing workshop. However, field research in a leading engine manufacturer in China has revealed that fixture-pallet resources are a key factor...
Persistent link: https://www.econbiz.de/10014360924
Internet healthcare provides a new access way for revisits through texts or videos, which can lighten the service load on offline hospitals. In this study, we investigate the dynamic integrated advance scheduling problem considering the complex coupling of stochastic and heterogeneous (e.g.,...
Persistent link: https://www.econbiz.de/10014255543