Showing 1 - 3 of 3
This paper is devoted to the calculation of the stability radius of an optimal schedule for a job shop problem, when the objective is to minimize mean or maximum flow times. The approach used may be regarded as an a posteriori analysis, in which an optimal schedule has already been constructed...
Persistent link: https://www.econbiz.de/10005336354
Persistent link: https://www.econbiz.de/10006522921
Persistent link: https://www.econbiz.de/10007368414