Showing 1 - 10 of 67
Persistent link: https://www.econbiz.de/10008702782
Persistent link: https://www.econbiz.de/10007870977
Persistent link: https://www.econbiz.de/10010257607
Persistent link: https://www.econbiz.de/10010461155
This paper analyzes the trade-off between (demand) substitution costs and (production) changeover costs in a discrete-time production-inventory setting using a two-product dynamic lot-sizing model with changeover, inventory carrying, and substitution costs. We first show that the problem is...
Persistent link: https://www.econbiz.de/10009218589
Persistent link: https://www.econbiz.de/10009866292
This paper analyzes the tradeoff between (demand) substitution costs and (production) changeover costs in a discrete-time production-inventory setting using a two-product dynamic lot-sizing model with changeover, inventory carrying, and substitution costs. We first show that the problem is...
Persistent link: https://www.econbiz.de/10014046787
A Dedicated Subnetwork (DSN) refers to a subset of lanes with associated loads in a shipper’s transportation network, for which a fleet of resources – trucks, drivers, and other equipment – is exclusively assigned to carry out all shipping requirements. The resources assigned to a DSN are...
Persistent link: https://www.econbiz.de/10014040979
Line extensions – variants of existing products with new appearances, functions, or forms – constitute a significant fraction of products launched each year. While line extensions typically share components with existing products and, therefore, require lower development costs (as compared...
Persistent link: https://www.econbiz.de/10014043276
Persistent link: https://www.econbiz.de/10003754517