Showing 1 - 7 of 7
Production systems with scrapped and rework items have recently become an interesting subject of research. While most … and without rework are studied where shortage is allowed and backordered. For each system, the optimal cycle length, the … applicability of the proposed models. Furthermore, the results obtained by solving the models with and without rework of defective …
Persistent link: https://www.econbiz.de/10009352921
In this paper, an economic production quantity (EPQ) inventory model with interruption in process, scrap and rework is …
Persistent link: https://www.econbiz.de/10011043276
Persistent link: https://www.econbiz.de/10011549201
Persistent link: https://www.econbiz.de/10010337023
Persistent link: https://www.econbiz.de/10011344718
Persistent link: https://www.econbiz.de/10011931148
of the system that are improving quality, reduction of setup cost, partial backordering and inspection process. The …
Persistent link: https://www.econbiz.de/10011906308