Showing 1 - 5 of 5
We study the multi-item economic lot scheduling problem (ELSP) with two sources of production: manufacturing of new items and remanufacturing of returned items. Manufacturing and remanufacturing operations are performed on the same production line. Tang and Teunter [2006. Economic lot scheduling...
Persistent link: https://www.econbiz.de/10005318233
We study the economic lot scheduling problem with two production sources, manufacturing and remanufacturing, for which operations are performed on separate, dedicated lines. We develop an exact algorithm for finding the optimal common-cycle-time policy. The algorithm combines a search for the...
Persistent link: https://www.econbiz.de/10005151531
Persistent link: https://www.econbiz.de/10008225887
Persistent link: https://www.econbiz.de/10008065289
Persistent link: https://www.econbiz.de/10008891916