Showing 1 - 2 of 2
This research focuses on the effect of setup time on lot sizing. The setting is the Capacitated Lot Sizing Problem (the single-machine lot sizing problem) with nonstationary costs, demands, and setup times. A Lagrangian relaxation of the capacity constraints of CLSP allows it to be decomposed...
Persistent link: https://www.econbiz.de/10009191407
This paper investigates a multi-item, multi-level production scheduling problem with linear costs and production and inventory constraints at one key facility. Two multi-item problems---one in which the constraint was on shipping capability and one in which there was a final stage bottleneck...
Persistent link: https://www.econbiz.de/10009197635