Showing 1 - 10 of 14
We present a finite capacity production scheduling algorithm for an integrated steel company located in Belgium. This multiple-objective optimization model takes various case-specific constraints into account and consists of two steps. A machine assignment step determines the routing of an...
Persistent link: https://www.econbiz.de/10005607038
Resource-constrained project scheduling with activity pre-emption assumes that activities are allowed to be interrupted and restarted later in the schedule at no extra cost. In the current paper, we extend this pre-emptive scheduling problem with setup times between activity interruptions and...
Persistent link: https://www.econbiz.de/10005607039
The resource-constrained project scheduling problem (RCPSP) has been extensively investigated during the past decades. Due to its strongly NP-hard status and the need for solving large realistic project instances, the recent focus has shifted from exact optimisation procedures to (meta-)...
Persistent link: https://www.econbiz.de/10005464791
The well-known resource-constrained project scheduling problem (RCPSP) schedules project activities within the precedence and renewable resource constraints while minimizing the total lead-time of the project. The basic problem description assumes non-pre-emptive activities with fixed durations,...
Persistent link: https://www.econbiz.de/10005464809
Persistent link: https://www.econbiz.de/10008163737
The scheduling of projects has gained increasing attention since the introduction of PERT and CPM. Both the scheduling literature and the software scheduling packages rely on (meta-)heuristic and exact procedures to schedule projects under various assumptions. However, there is still room for...
Persistent link: https://www.econbiz.de/10008684346
In this paper, we present a scatter search algorithm for the well-known nurse scheduling problem (NSP). This problem aims at the construction of roster schedules for nurses taking both hard and soft constraints into account. The objective is to minimize the total preference cost of the nurses...
Persistent link: https://www.econbiz.de/10005607050
In this paper, we present a meta-heuristic algorithm for the well-known resource-constrained project scheduling problem with discounted cash flows. This optimization procedure maximizes the net present value of project subject to the precedence and renewable resource constraints. The problem is...
Persistent link: https://www.econbiz.de/10005464835
Earned value project management is a well-known management system that integrates cost, schedule and technical performance. It allows the calculation of cost and schedule variances and performance indices and forecasts of project cost and schedule duration. The earned value method provides early...
Persistent link: https://www.econbiz.de/10005243380
Persistent link: https://www.econbiz.de/10008322294