Showing 1 - 1 of 1
The goal of the work was to fi nd out the best performance of a closed wet cooling tower system combined with chilled ceiling, serving a residential building. The research method was building simulation combined with optimisation. IDA-ICE was used for simulation together with GenOpt optimisation...
Persistent link: https://www.econbiz.de/10010566841