Showing 1 - 5 of 5
This paper studies a solar cell industry scheduling problem which is similar to the traditional hybrid flow shop scheduling (HFS). In a typical HFS with parallel machines problem, the allocation of machine resources for each order should be scheduled in advance and then the optimal...
Persistent link: https://www.econbiz.de/10011043191
Persistent link: https://www.econbiz.de/10010163811
Persistent link: https://www.econbiz.de/10010076365
Persistent link: https://www.econbiz.de/10010094113
Persistent link: https://www.econbiz.de/10010054474