Showing 1 - 3 of 3
The problem of simultaneous due-date setting and priority sequencing is analyzed in the setting of a multiclass M/G/1 queueing system. The objective is to minimize the weighted average due-date lead time (due-date minus arrival date) of jobs subject to a constraint on either the fraction of...
Persistent link: https://www.econbiz.de/10009204511
Motivated by semiconductor wafer fabrication, we consider a scheduling problem for a single-server multiclass queue. A single workstation fabricates semiconductor wafers according to a variety of different processes, where each process consists of multiple stages of service with a different...
Persistent link: https://www.econbiz.de/10009214599
We consider a production stage that produces a single item in a make-to-stock manner. Demand for finished goods is stationary. In each time period, an updated vector of demand forecasts over the forecast horizon becomes available for use in production decisions. We model the sequence of forecast...
Persistent link: https://www.econbiz.de/10009198068