Showing 1 - 10 of 15
Persistent link: https://www.econbiz.de/10009685678
Persistent link: https://www.econbiz.de/10010493066
Persistent link: https://www.econbiz.de/10011518969
Persistent link: https://www.econbiz.de/10009526866
Persistent link: https://www.econbiz.de/10009768437
Persistent link: https://www.econbiz.de/10009716277
Persistent link: https://www.econbiz.de/10009785326
Persistent link: https://www.econbiz.de/10008759746
In this paper, we focus on the relationship between operations-based variables (specifically, production speed, scrap rate and maintenance speed) and the manufacturing cost. These variables usually produce opposite influences on the variable cost and the fixed cost. For example, setting the...
Persistent link: https://www.econbiz.de/10010729601
This paper studies a job shop scheduling problem with two new objective functions based on the setup and synergy costs besides the traditional total weighted tardiness criterion. The background is found in the real-world situation of a commercial vehicle producer, where the reduction of...
Persistent link: https://www.econbiz.de/10010869099