Showing 1 - 4 of 4
In this study, an interval-parameter minimax regret programming (IMRP) method is developed for supporting the power management systems planning under uncertainty. This method incorporates techniques of interval linear programming (ILP) and minimax regret programming (MRP) within a general...
Persistent link: https://www.econbiz.de/10008913782
In this study, a multistage stochastic inexact chance-constraint programming (MSICCP) model is developed for power supply management under uncertainties. In the MSICCP model, methods of multistage stochastic programming (MSP), interval-parameter programming (IPP), and chance-constraint...
Persistent link: https://www.econbiz.de/10011077264
In this study, a multistage interval-stochastic regional-scale energy model (MIS-REM) is developed for supporting electric power system (EPS) planning under uncertainty that is based on a multistage interval-stochastic integer linear programming method. The developed MIS-REM can deal with...
Persistent link: https://www.econbiz.de/10008473860
Persistent link: https://www.econbiz.de/10008891427