Showing 1 - 4 of 4
An optimal and redundant building cooling heating and power (BCHP) system can yield economical savings, but more importantly can save energy as well as reduce the emission of pollutants. This paper presents the energy flow analysis of the conventional separation production (SP) system and the...
Persistent link: https://www.econbiz.de/10008916651
The energetic and environmental performances of building cooling heating and power (BCHP) system are closely dependent on its design and operation strategy. This paper analyzes the energy consumptions of a conventional separation production (SP) system and a BCHP system respectively and...
Persistent link: https://www.econbiz.de/10010810045
The performance of building cooling heating and power (BCHP) system is obviously dependent upon the seasonal atmospheric conditions and the building types. This paper presents the energy flow analysis and the evaluation criteria of the redundant BCHP system and describes the optimal design...
Persistent link: https://www.econbiz.de/10010572087
The optimization of building cooling heating and power (BCHP) system is helpful to improve its comprehensive performance including energetic, economic and environmental aspects. However, the optimal results are closely dependent on the initial setting parameters. This paper deduces the energy...
Persistent link: https://www.econbiz.de/10010572092