Showing 1 - 2 of 2
The generation of leveled production schedules is of high impor-tance for mixed-model assembly lines whose parts and materials are suppliedjust-in-time by multi-level production processes. The Output Rate Variatonproblem is the standard mathematical representation of this complex levelscheduling...
Persistent link: https://www.econbiz.de/10005870722
to re-engage voters. In this paper, we test whether thecost reductions with postal voting increase turnout. The empirical … voting on turnout, independent of time,issue and canton specific effects. The estimated average effect on turnout is roughly … 4.1percentage points for an average turnout of 43 percent between 1970 and 2005. …
Persistent link: https://www.econbiz.de/10005867927