Showing 1 - 10 of 104
Personnel Research and Development Center (NPRDC), reviews existing forecasting and simulation methodologies and suggests new …
Persistent link: https://www.econbiz.de/10009435679
) that achieves the lowest total project cost for a given probability of success while meeting technical performance and … Monte Carlo simulation tools. The approach is detailed using a realistic but simplified case of a project with two technical …
Persistent link: https://www.econbiz.de/10009435988
The purpose of this document is to introduce and describe the Livermore Computing Production Control System, commonly called the PCS. Resource management is very difficult in typical UNIX and related systems. The weakness involves the allocation, control and delivery of the usage of computer...
Persistent link: https://www.econbiz.de/10009436594
This paper discusses management issues associated with the design and implementation of an automated audit analysis system that we use to detect security events. It gives the viewpoint of a team directly responsible for developing and managing such a system. We use Los Alamos National...
Persistent link: https://www.econbiz.de/10009436980
American industry the need for ever higher levels of performance. And, similar forces are necessitating improved performance in … cost, schedule and product performance that characterize the modern Quality ethic. This paper discusses the manager's role …
Persistent link: https://www.econbiz.de/10009435384
are predicated to varying degrees on the reliable and correct performance of this software. Consequently, software quality …
Persistent link: https://www.econbiz.de/10009435640
, Methods, and Rules for Managing Cooperation for Performance Improvement. Continuous performance improvement is a gradual … (people sharing information and coordinating effort). Therefore, continuous performance improvement requires working …
Persistent link: https://www.econbiz.de/10009435663
This progress report summarizes our research activities under our consensus grant. In year four of the grant, we continued to capitalize on and benefit from historical events which drove our early emphasis on group process studies. Following our work on various procedures for bringing together...
Persistent link: https://www.econbiz.de/10009435829
Project Performance. Both sections contain a set of questions that can be answered with a 5-point Likert scale response. The … future national needs. The project Performance section consists of nine questions designed to determine PNNL performance in … performance expectation for the laboratory, and then to assess progress. The gold standard is defined using laboratory management …
Persistent link: https://www.econbiz.de/10009436455
performance of a radioactive waste facility. A summary description of 162 computer codes is given. The identified computer … programs address the performance of waste packages, waste transport and equilibrium geochemistry, hydrological processes in … unsaturated and saturated zones, and general waste facility performance assessment. Some programs also deal with thermal analysis …
Persistent link: https://www.econbiz.de/10009436493