In this Appendix, the study framework and evaluation for economic and technical factors are explained. This material documents the analysis performed for Section 4.8 of the EIS. Coupled with the environmental analysis, the evaluation factors described below will be used to judge the relative...
Persistent link: https://www.econbiz.de/10009437383
The paper discusses traditional arguments for utility regulation in the context of the current utility environment. It reviews several DSM delivery options using a matrix of key financial considerations for utilities and consumers. The strengths and weaknesses of each option are discussed and an...
Persistent link: https://www.econbiz.de/10009437395
Dr. Mock began the session by paying tribute to Dr. Myron Dorfman, Professor of Petroleum Engineering at the University of Texas, who had just passed away after a protracted illness. Dr. Dorfman, more than other any individual, was responsible for bringing the geopressured-geothermal...
Persistent link: https://www.econbiz.de/10009435411
The market for small wind systems in the United States, often defined as systems less than or equal to 100 kW that produce power on the customer side of the meter, is small but growing steadily. The installed capacity of domestic small wind systems in 2002 was reportedly 15-18 MW, though the...
Persistent link: https://www.econbiz.de/10009435571
The incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative measures and their systemwide implications. The BPA anticipate...
Persistent link: https://www.econbiz.de/10009435604
As the mitigation prescribed by the Regional Act proceeds, the incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative...
Persistent link: https://www.econbiz.de/10009435605
Programs in Perspective is the Bonneville Power Administration's public involvement process (PIP) for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA effort. This planning leads into a biennial rate setting cycle and...
Persistent link: https://www.econbiz.de/10009435625
Texas has rapidly emerged as one of the leading wind power markets in the United States. This development can be largely traced to a well-designed and carefully implemented renewables portfolio standard (RPS). The RPS is a new policy mechanism that has received increasing attention as an...
Persistent link: https://www.econbiz.de/10009435713
There are numerous conditions of the generation system that may ultimately develop into system states affecting system reliability and security. Such generation system conditions should also be considered when evaluating the potential impacts on system operations. The following five issues have...
Persistent link: https://www.econbiz.de/10009435718
Building on the two previous trips to Central America last year, International Power Institute (IPI) and its partner Tennessee Valley Infrastructure Group (TVIG) have focused their attention this quarter on project sites in Honduras. TVIG's unit--an Integrated Infrastructure Platform or...