Showing 1 - 10 of 61
Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based … architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage … architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on …
Persistent link: https://www.econbiz.de/10009435707
-tier information architecture that requires: • Maintenance of various field devices, telemetry collection, and/or industrial …
Persistent link: https://www.econbiz.de/10009436060
analyses form the foundation or basic architecture upon which other task areas are based: hazard analyses, performance measures …, and risk indicator design. To carry out these other tasks, models may need to be developed using the basic architecture of …
Persistent link: https://www.econbiz.de/10009436802
-tier information architecture that requires: Maintenance of various field devices, telemetry collection, and/or industrial …
Persistent link: https://www.econbiz.de/10009437276
will be determined not by its technology, but by its system architecture. Fortunately, we have a recent example of a …
Persistent link: https://www.econbiz.de/10009437326
Contractor prequalification involves the establishment of a standard for measuring and assessing the capabilities of potential tenderers. The required standard is based on a set of PreQualification Criteria (PQC) that is intended to reflect the objectives of the client and the requirements of...
Persistent link: https://www.econbiz.de/10009437459
Under the normal conditions of construction contracts, the client is obliged to pay the contractor in monthly instalments. The amount of each instalment is based on the value of construction work actually produced in the previous month and forecasts are needed in advance of the likely value of...
Persistent link: https://www.econbiz.de/10009437512
The paper describes three analyses to examine differences in construction company POT profitability between (1) different financial years, and (2) different sizes of companies. In the first analysis, the aggregated profitability of a sample of 80 UK general contractors was found not to differ...
Persistent link: https://www.econbiz.de/10009437513
We introduce three new mechanisms that allow trust to be built into cloud computing called the Private Virtual Infrastructure (PVI), the Locator Bot (LoBot), and the Trusted Virtual Environment Module (TVEM). Cloud computing requires that organizations trust that a service provider’s platforms...
Persistent link: https://www.econbiz.de/10009439441
Purpose – This article aims to provide details of the process involved in preparing a comprehensive maintenance audit of school buildings and facilities in a state government education department.Design/methodology/approach – This paper presents the framework and logistics of the survey or...
Persistent link: https://www.econbiz.de/10009441692