Showing 1 - 10 of 257
This slide presentation describes the origin, approach and deliverables of course Org. Dynm.633, on “Leadership from … organizational challenges and realities and then in designing an idealized leadership approach in class. Between classes students …
Persistent link: https://www.econbiz.de/10009439227
predetermining climate in an enterprise, i.e., motivation, leadership, communication and organisational structure. Thus …
Persistent link: https://www.econbiz.de/10012813226
the DHF test and the modified HEGY test, we find that the DHF test does not have asymptotic power one when the series only … contains more partial unit roots. For the DHF test, the test power depends on the augmented model. We derive limits of the … from the augmented model suggested by Ghysels et al. (1992) has relatively low power. For the HEGY/Kunst test, most …
Persistent link: https://www.econbiz.de/10009431159
that from the perspective of bias, efficiency, power, robustness or research costs, and in large or small samples, pairing …
Persistent link: https://www.econbiz.de/10009431899
benchmark data, generated under 51 different clustering models, to compare the statistical power of several disease clustering …: Except for Moran's I and Whittemore's test, all other tests have good power for detecting some kind of clustering. The … appropriate choice of parameter, Besag-Newell's R and Cuzick-Edwards' k-NN also perform well. Conclusion: The power varies greatly …
Persistent link: https://www.econbiz.de/10009432001
The incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative measures and their systemwide implications. The BPA anticipate...
Persistent link: https://www.econbiz.de/10009435604
As the mitigation prescribed by the Regional Act proceeds, the incremental costs of corrective measures to lessen the environmental impacts of the hydroelectric system are expected to increase and difficult questions to arise about the costs, effectiveness, and justification of alternative...
Persistent link: https://www.econbiz.de/10009435605
Competitive bidding for electric power is maturing. Increasing numbers of utilities are soliciting proposals from …
Persistent link: https://www.econbiz.de/10009435622
(Electric Power Supply Analysis Model), one component of this overall program, is a simulation model of the electric supply … test their effect on the cost and availability of power. ELSA is divided into three major sectors: production, regulatory …
Persistent link: https://www.econbiz.de/10009435646
This study identifies a strategy that (1) provides future energy services for Hainan in the least environmentally degrading way, (2) eliminates the need to build significant amounts of new fossil-fueled, electric generating capacity, saving capital to invest in other development projects, (3)...
Persistent link: https://www.econbiz.de/10009435877