Showing 81 - 90 of 156
This paper describes the development of standards for emergency operations computer systems for the US Department of Energy (DOE). The proposed DOE computer standards prescribe the necessary power and simplicity to meet the expanding needs of emergency managers. Standards include networked UNIX...
Persistent link: https://www.econbiz.de/10009435814
This paper describes the development of standards for emergency operations computer systems for the US Department of Energy (DOE). The proposed DOE computer standards prescribe the necessary power and simplicity to meet the expanding needs of emergency managers. Standards include networked UNIX...
Persistent link: https://www.econbiz.de/10009435997
automation in DR can be defined as follows: Manual Demand Response involves a potentially labor-intensive approach such as …
Persistent link: https://www.econbiz.de/10009436026
The Community-Level Impacts Projection System includes a set of techniques for providing detailed advance information required for rational planning. The computerized system generates reports which enable the user: to describe the energy development activity in terms of its employment demands...
Persistent link: https://www.econbiz.de/10009436029
12 to 18 hours to complete. As such, it is difficult, prone to errors, and very tempting to shortcut. Automation of this …
Persistent link: https://www.econbiz.de/10009436074
attractive and technologically feasible. Automation will make DR: More visible by providing greater transparency through two … because automation can help reduce labor costs associated with manual DR strategies initiated by facility staff and can be …
Persistent link: https://www.econbiz.de/10009436228
programs like CPP, another barrier is the lack of automation of DR systems. During 2003 and 2004, the PIER Demand Response … facilities. Many electricity customers have suggested that automation will help them institutionalize their electric demand … system. (3) Determine how customers will respond to this form of automation for CPP. (4) Evaluate what type of DR shifting …
Persistent link: https://www.econbiz.de/10009436367
cross-sector Instrumentation, Systems, and Automation Society (ISA) Technical Reports (TR) 99 -1 and -2 to the Framework …
Persistent link: https://www.econbiz.de/10009436553
Working Calibration and Test Material (WCTM) solutions are essential as standards in the surveillance of analytical methods, the calibration of equipment and methods, and the training and testing of laboratory personnel. Before the WCTM can be used it must be characterized. That is, the WCTM...
Persistent link: https://www.econbiz.de/10009436579
Pacific Northwest Laboratory developed this report for the US Navy`s Naval Undersea Warfare Center Division Newport, Rhode Island (NUWC). The purpose of the report was to review options for metering electricity and steam used in the NUWC compound, and to make recommendations to NUWC for...
Persistent link: https://www.econbiz.de/10009436592