Showing 1 - 10 of 455
hours in combination with wage subsidies). Using a vector error correction model (VECM) for several labour market variables …-Fehlerkorrektur-Modells (VECM) für verschiedene Arbeitsmarktvariablen sowie die Inflationsrate und das Inlandsprodukt generieren die Autoren …
Persistent link: https://www.econbiz.de/10003744522
Persistent link: https://www.econbiz.de/10009503506
The topic of this paper is the estimation uncertainty of the Stock-Watsonand Gonzalo-Granger permanent-transitory decompositions in the frameworkof the cointegrated vector-autoregression. Specifically, we suggest an approach to construct the confidence interval of the transitory component in...
Persistent link: https://www.econbiz.de/10009530402
Persistent link: https://www.econbiz.de/10009532181
Persistent link: https://www.econbiz.de/10011389917
Persistent link: https://www.econbiz.de/10011398114
Persistent link: https://www.econbiz.de/10011398635
Persistent link: https://www.econbiz.de/10011401472
Persistent link: https://www.econbiz.de/10010514435
Persistent link: https://www.econbiz.de/10010518966