Showing 1 - 10 of 169
This paper considers nonparametric identification and estimation of the regression function when a covariate is mismeasured. The measurement error need not be classical. Employing the small measurement error approximation, we establish nonparametric identification under weak and...
Persistent link: https://www.econbiz.de/10014581847
This paper proposes a powerful alternative to the t-test of the null hypothesis that a coefficient in linear regression is equal to zero when a regressor is mismeasured. We assume there are two contaminated measurements of the regressor of interest. We allow the two measurement errors to be...
Persistent link: https://www.econbiz.de/10014480598
Single round robin tournaments are a well known class of sports leagues schedules. We consider leagues with a set T of n teams where n is even. Costs are associated to each possible match. Moreover, stadium availability, fixed matches, and regions' capacities are taken into account. The goal is...
Persistent link: https://www.econbiz.de/10011558714
Single round robin tournaments are a well known class of sports leagues schedules. We consider leagues with a set T of n teams where n is even. Costs are associated to each possible match. The goal is to find the minimum cost tournament among those having the minimum number of breaks. We pick up...
Persistent link: https://www.econbiz.de/10011558829
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011558725
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem (RCPSP) have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences, feasible completion times or feasible subsets, they all...
Persistent link: https://www.econbiz.de/10011558739
Numerous exact algorithms have been developed for solving the resource-constrained project scheduling problem. Experimental studies have shown that currently even projects with only 60 activities cannot be optimally solved within a reasonable amount of time. Therefore heuristics employing...
Persistent link: https://www.econbiz.de/10011558746
The 0-1 knapsack problem with a single continuous variable (KPC) is a natural extension of the binary knapsack problem (KP), where the capacity is not any longer fixed but can be extended which is expressed by a continuous variable. This variable might be unbounded or restricted by a lower or...
Persistent link: https://www.econbiz.de/10011558835
We consider an extension of the classical resource-constrained project scheduling problem (RCPSP), which covers discrete resource-resource and time-resource tradeoffs. As a result a project scheduler is permitted to identify several alternatives or modes of accomplishment for each activity of...