In projects with a flexible project structure, the activities that have to be scheduled are not completely known beforehand. Instead, scheduling such a project includes the decision whether to carry out particular activities at all. This also effects precedence constraints between the finally...
Persistent link: https://www.econbiz.de/10010294420
We study the problem of determining both the structure and the schedule of projects subject to capacity constraints. We assume that those projects are flexible in the sense that the activities to be implemented are not entirely known in advance. In such a setting, decisions must be made with...
Persistent link: https://www.econbiz.de/10011324714
This paper presents a generic modeling framework to simultaneously decide about production quantities and maintenance operations for a capacitated resource facing a dynamic demand for di erent types of products. As the resource needs to be setup for each speci c type of product, a lot-sizing...
Persistent link: https://www.econbiz.de/10010332632
The transportation processes for patients, personnel, and material in large and complex maximum-care hospitals with many departments can consume significant resources and thus induce substantial logistics costs. These costs are largely determined by the allocation of the different departments...
Persistent link: https://www.econbiz.de/10010352207
This paper presents a profit-oriented shift scheduling approach for inbound contact centers. The focus is on systems in which multiple agent classes with different qualifications serve multiple customer classes with different needs. We assume that customers are impatient, abandon if they have to...
Persistent link: https://www.econbiz.de/10010264932
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10010264940
This paper presents an optimization-based solution approach for the dynamic multi-level capacitated lot sizing problem (MLCLSP) with positive lead times. The key idea is to solve a series of mixed-integer programs in an iterative fix-and-optimize algorithm. Each of these programs is optimized...
Persistent link: https://www.econbiz.de/10010264943
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10010264947
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10010270043
Long-term throughput, as a key performance indicator of a stochastic flow line, is affected by numerous parameters describing the features of the flow line, such as processing time and buffer size. Fast and accurate evaluation methods for a given set of values for those parameters are a...
Persistent link: https://www.econbiz.de/10014554639