Showing 1 - 10 of 300
Recently, Branzei, Dimitrov, and Tijs (2003) introduced cooperative interval-valued games. Among other insights, the notion of an interval core has been coined and proposed as a solution concept for interval-valued games. In this paper we will present a general mathematical programming algorithm...
Persistent link: https://www.econbiz.de/10010421344
Persistent link: https://www.econbiz.de/10010306018
We consider an economic order quantity model where the supplier offers an all-units quantity discount and a price …
Persistent link: https://www.econbiz.de/10010421328
In a recent paper, Fisher et al. (2001) present a method tomitigate end-effects in lot sizing by including a valuation term for end-of-horizon inventory in the objective function of the short-horizon model. Computational tests show that the proposed method outperforms the Wagner-Whitin algorithm...
Persistent link: https://www.econbiz.de/10010324957
This contribution presents an efficient solution method for solving the major short-term planning problems which occur, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling. Since both problems heavily interact, we propose an...
Persistent link: https://www.econbiz.de/10011558736
Zur Lösung des Economic Lot Scheduling Problems (ELSP) finden sich in der Literatur drei Ansätze mit unterschiedlich einschränkenden Annahmen: - Ansatz des gemeinsamen Produktzyklus (Common-Cycle-Approach) - Ansatz der gemeinsamen Basisperiode (Basic-Period-Approach) - Ansatz der variierenden...
Persistent link: https://www.econbiz.de/10011817524
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production...
Persistent link: https://www.econbiz.de/10010264947
and remanufacturing costs, and unit holding costs at the vendor and the purchaser, the cost-minimal order/lot sizes and … setting an order size. …
Persistent link: https://www.econbiz.de/10010306295
The "Capacitated lot sizing problem with setup carry-over" is based ort the well known "Capacitated lot sizing problem" and incorporates the possibility of preserving a setup-state from a period to the following. Sox and Gao [2] decompose their formulation of the first one (GCLP1) by Lagrangian...
Persistent link: https://www.econbiz.de/10011558795
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011558745