Gegenstand der vorliegenden Arbeit sind zwei praktisch und theoretisch bedeutsame Probleme, die bei just-in-time orientierter Variantenfließfertigung auftreten. Ein Problem besteht darin, den Teilebedarf in der Endmontage so konstant wie möglich zu halten ("Level Scheduling Problem"). Das...
Persistent link: https://www.econbiz.de/10011558743
In this paper an improved set of benchmark instances for the simple assembly line balancing problem is presented. The benchmark set currently available consists of instances with 7 to 297 tasks to be executed. Although claims made in the literature state that instances with up to 1000 tasks can...
Persistent link: https://www.econbiz.de/10011558759
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011558763
A flow line consists of a sequence of work places (or stations) through which one or more producta (or models) move one-way in order to be processed. Each model requires specific Operations which must be performed in a predefined Order. To be able to do so, the stations must be equipped with...
Persistent link: https://www.econbiz.de/10011583028
While balancing straight assembly lines is a well-studied problem, the Situation where the assembly line has a U-shaped Iayout is a still emerging research field. The advantage of these lines is that workers may simply turn around to operate at two legs of the line. Hence, there is an additional...
Persistent link: https://www.econbiz.de/10011583034
This paper presents a linear programming approach to analyze and optimize flow lines with limited buffer capacities and stochastic processing times. The basic idea is to solve a huge but simple linear program that models an entire simulation run of a multi-stage production process in discrete...
Persistent link: https://www.econbiz.de/10010264940
This paper treats the problem of setting the inventory level of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a huge but simple linear program that models an entire simulation run of a closed-loop flow line in discrete time to determine a...
Persistent link: https://www.econbiz.de/10010270043
This paper treats the problem of setting the inventory level and optimizing the buffer allocation of closed-loop flow lines operating under the constant-work-in-process (CONWIP) protocol. We solve a very large but simple linear program that models an entire simulation run of a closed-loop flow...
Persistent link: https://www.econbiz.de/10010421360
The car sequencing problem determines sequences of different car models launched down a mixed-model assembly line. To avoid work overloads of workforce, car sequencing restricts the maximum occurrence of labor-intensive options, e.g., a sunroof, by applying sequencing rules. We consider this...
Persistent link: https://www.econbiz.de/10010421366
Ist Montage einfache Arbeit, die nach kurzer Einarbeitung auch von Ungelernten bewältigt werden kann? Oder ist Montage moderne Arbeit mit Anspruch an Qualität und Mitdenken innerhalb Ganzheitlicher Produktionssysteme? Und ist Montage überhaupt noch ein zukunftsfähiges Thema in Deutschland?...
Persistent link: https://www.econbiz.de/10010291025