Showing 1 - 10 of 72
In this paper, we address the backlog sequencing problem in a flow-shop controlled by a CON\VIP production control system with the objective to minimise the make span We characterise the problem and analyse its similarities and differences with the permutation flow-shop problem A comparison of...
Persistent link: https://www.econbiz.de/10010306016
We study the trip scheduling preferences of train commuters in a real-life setting. The underlying data have been …
Persistent link: https://www.econbiz.de/10011403536
In travel surveys most respondents apply rounding of departure andarrival times to multiples of 5, 15 and 30minutes: in the annual Dutch travel survey about 85-95 percent of allreported times are 'round' ones. We estimaterounding models for departure and arrival times. The model allows oneto...
Persistent link: https://www.econbiz.de/10010324860
time cost, scheduling cost and the cost of missing a flight. In this model, the value of reliability for air travelers is …
Persistent link: https://www.econbiz.de/10010325711
Traffic congestion contributes to longer travel times and increased travel time variability. We account for the dynamic nature of travellers' choices, by deriving a closed-form solution for the costs of travel time variability. The resulting travel delay cost function is linear in the mean...
Persistent link: https://www.econbiz.de/10010326301
We derive the expected user costs of US domestic air travel delay variability taking into account scheduling behavior … of travelers. Travelers do not only consider mean arrival delays, but also face scheduling costs because they arrive too …
Persistent link: https://www.econbiz.de/10010326349
context of transport scheduling. Two competitors choose fares and departure times in a fixed time interval. Consumers are …
Persistent link: https://www.econbiz.de/10010326505
We address the scheduling problem of reordering an existing queue into its efficient order through trade. To that end …
Persistent link: https://www.econbiz.de/10010334096
closely related with the scheduling problem with eligibility constraint or the generalized assignment problem. The polynomial …
Persistent link: https://www.econbiz.de/10011558712
, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling …
Persistent link: https://www.econbiz.de/10011558736