availability constraints into account. The objective is to minimize the sum of the weighted tardiness. We propose a MIP-model of …
Persistent link: https://www.econbiz.de/10011558728
We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011558732
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011558763
Zur Lösung des Economic Lot Scheduling Problems (ELSP) finden sich in der Literatur drei Ansätze mit unterschiedlich einschränkenden Annahmen: - Ansatz des gemeinsamen Produktzyklus (Common-Cycle-Approach) - Ansatz der gemeinsamen Basisperiode (Basic-Period-Approach) - Ansatz der variierenden...
Persistent link: https://www.econbiz.de/10011817524
Purpose: The purpose of this research is to develop an optimization model of CNC turning process. The objective function of the model is to minimize processing time and carbon emission. We implemented the results of optimization with real machining application using a certain workpiece....
Persistent link: https://www.econbiz.de/10013326242
A flow line consists of a sequence of work places (or stations) through which one or more producta (or models) move one-way in order to be processed. Each model requires specific Operations which must be performed in a predefined Order. To be able to do so, the stations must be equipped with...
Persistent link: https://www.econbiz.de/10011583028
This paper presents a mixed-integer program for the dynamic lot sizing and scheduling problem in a multi-level, single-machine environment. It turns out that in contrast to single-level problems the integration of initial inventory is a crucial aspect if generality should not be lost. It is...
Persistent link: https://www.econbiz.de/10011594606
Complexity proofs often restrict themselves to stating that the problem at hand is a generalization of some other intractable problem, This proof technique relies on the widely accepted assumptions that complexity results hold regardless of the model formulation used to represent the problem and...
Persistent link: https://www.econbiz.de/10011594619
NP-completeness and other complexity proofs often merely State that the problem at hand is a generalization of some other intractable problem. This proof technique relies on the widely accepted assumption that complexity results hold regardless of the model formulation used to represent the...
Persistent link: https://www.econbiz.de/10011594620
This paper deals with lot sizing and scheduling for a single-stage production System where setup costs and times are sequence dependent. A large bücket mixed integer programming (MIP) model is formulated which considers only efficient sequences. A tailor-made enumeration method of the...
Persistent link: https://www.econbiz.de/10011594621