Showing 1 - 10 of 12,341
möglich zu halten ("Level Scheduling Problem"). Das zweite Problem versucht, die Belastung der Arbeitsstationen möglichst … the final assembly as constant as possible ("level scheduling problem") while the other is to keep the line's Workstations …
Persistent link: https://www.econbiz.de/10011558743
feasible sequences are provided. Second, an algorithm is presented which can optimize a level scheduling objective while taking …
Persistent link: https://www.econbiz.de/10011558763
context of transport scheduling. Two competitors choose fares and departure times in a fixed time interval. Consumers are …
Persistent link: https://www.econbiz.de/10010326505
, if lot production has to be managed. In our focus are the two most important aspects, i.e. lot sizing and scheduling …
Persistent link: https://www.econbiz.de/10011558736
project scheduling problems. First, the two problem categories are described. This includes a classification of packing … problems as well as of project scheduling concepts. While both problem classes are different with respect to their fields of … special cases of models for project scheduling. The aim is to indicate which project scheduling models can be used to capture …
Persistent link: https://www.econbiz.de/10011558750
In this paper, we propose a general model for various scheduling problems that occur in container terminal logistics …. The scheduling model consists of the assignment of jobs to resources and the temporal arrangement of the jobs subject to … real-world problems from container terminals in the port of Hamburg (Germany). We consider scheduling problems for straddle …
Persistent link: https://www.econbiz.de/10011558786
determination problem here can be described as so-called Weighted Job Interval Scheduling Problem (WJISP). Since this problem is …
Persistent link: https://www.econbiz.de/10011558787
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to …
Persistent link: https://www.econbiz.de/10011640901
The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi …: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in … decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order …
Persistent link: https://www.econbiz.de/10011773036
The main aim of the paper is to highlight the relation between flexibility and vertical integration. To this purpose, we go through the selection of the optimal degree of vertical disintegration of a flexible firm which operates in a dynamic uncertain environment. The enterprise we model enjoys...
Persistent link: https://www.econbiz.de/10010331069