heuristics do better. In priority rule-based scheduling, attempts to remedy this have been made by combining simple priority …
Persistent link: https://www.econbiz.de/10011558738
This paper presents a mixed-integer program for the dynamic lot sizing and scheduling problem in a multi-level, single-machine environment. It turns out that in contrast to single-level problems the integration of initial inventory is a crucial aspect if generality should not be lost. It is...
Persistent link: https://www.econbiz.de/10011594606
This contribution presents two heuristic approaches for multi-level, single-machine lot sizing and scheduling. The first one is a variant of a so-called randomized regret based heuristic which is assumed to be the fastest available method for this particular class of problems. The second...
Persistent link: https://www.econbiz.de/10011613745
In this paper we propose a new heuristic to solve the well-known multiple resource-constrained project scheduling problem. The method is basically a biased random sampling procedure which shows extremely good results by use of the following features: A problem-based selection of the solution...
Persistent link: https://www.econbiz.de/10011613750
This contribution acquaints the reader with a model for multi-level single-machine proportional lot sizing and scheduling problems (PLSPs) that appear in the scope of short-term production planning. It is one of the first papers that deals with dynamic capacitated multi-level lot sizing and...
Persistent link: https://www.econbiz.de/10011613751
The problem of scheduling multiple, large scale, make-to-order assemblies is considered. Beside "classical" precedence- and resource constraints as known from resource constrained project scheduling we take spatial resource and part availability constraints into account. The objective is to...
Persistent link: https://www.econbiz.de/10011558728
We consider the problem of scheduling multiple, large-scale, make-to-order assemblies under resource, assembly area, and part availability constraints. Such problems typically occur in the assembly of high volume, discrete make-to-order products. Based on a list scheduling procedure which has...
Persistent link: https://www.econbiz.de/10011558732
The car sequencing problem is to find feasible sequences of product variants requiring specific options while taking care of sequencing constraints. First, a branching scheme and constraint propagation algorithms for the computation of feasible sequences are provided. Second, an algorithm is...
Persistent link: https://www.econbiz.de/10011558763
Zur Lösung des Economic Lot Scheduling Problems (ELSP) finden sich in der Literatur drei Ansätze mit unterschiedlich einschränkenden Annahmen: - Ansatz des gemeinsamen Produktzyklus (Common-Cycle-Approach) - Ansatz der gemeinsamen Basisperiode (Basic-Period-Approach) - Ansatz der variierenden...
Persistent link: https://www.econbiz.de/10011817524
individuals use simple rules of thumb (heuristics) to forecast the future inflation and output gap. We compare this model with the …
Persistent link: https://www.econbiz.de/10011604943