Showing 1 - 10 of 510
Over the last two decades, a number of financial disasters have occurred due to failure in risk management procedures. If some, as the Asian financial crisis, had a very much more muted global impact (even though they sent shock waves through global financial markets, the main damage were fairly...
Persistent link: https://www.econbiz.de/10010148075
Company valuation is not done after having generated a few values being a result of applying different valuation methods. In many cases institutions ordering the valuation request a value which can be an equivalent of a market, transactional value. Often the one method (and the valuation...
Persistent link: https://www.econbiz.de/10009959718
The subject of the article is the presentation of an unconventional method of establishing the value of the company together with investment ventures basing on the concept of real options (Real Option Valuation ROV). The option calculation can be applied in many areas, such as: evaluation of...
Persistent link: https://www.econbiz.de/10010009389
Persistent link: https://www.econbiz.de/10008276085
Persistent link: https://www.econbiz.de/10008276130
Persistent link: https://www.econbiz.de/10008404916
Persistent link: https://www.econbiz.de/10010186731
Using the maximum likelihood method, in order to estimate Half-Normal stochastic frontier production models, entails several practical di±culties that, perhaps, have not been su±ciently emphasised. In employing FRONTIER software, we analyse the case in which the estimation obtained suggests...
Persistent link: https://www.econbiz.de/10009957389
Grey system theory can powerfully deal with incomplete and uncertain information. In this paper, we introduced an improved grey GM(1,1) model that integrates residual modification with Markov chain model. By this model, we improved the forecast accuracy of original grey forecast model and...
Persistent link: https://www.econbiz.de/10009958471
The paper intends to measure the daily Value-at-Risk (VaR) for Rial-Euro exchange rate fluctuations risk. Since in this case we deal with a single risk factor, so we will not use the Monte Carlo simulation method to measure the VaR and we will only use the parametric and historical simulation...
Persistent link: https://www.econbiz.de/10010009131