Showing 1 - 4 of 4
In a mixed-model assembly line dierent models of a common base product can be manufactured in intermixed production sequences. A famous solution approach for the resulting short-term sequencing problem is the so called level scheduling problem, which aims at evenly smoothing the material...
Persistent link: https://www.econbiz.de/10005835230
Transshipment yards, where gantry cranes allow for an effcient transshipment of containers between different freight trains, are important entities in modern railway systems and facilitate the general shift from point-to-point transport to hub-and-spoke railway systems. Modern rail-rail...
Persistent link: https://www.econbiz.de/10005785949
A mixed-model assembly line enables the joint production of dierent models of a common base product in intermixed model sequence (lot size one). Previous approaches for the short-term planning task of model sequencing either aim at minimizing work overload (mixed-model sequencing and car...
Persistent link: https://www.econbiz.de/10005785951
Scheduling landings of aircrafts is an essential problem which is continuously solved as part of the daily operations of an airport control tower. All planes in the airspace of an airport are to be assigned to landing slots by the responsible air-traffic controller. The support of this decision...
Persistent link: https://www.econbiz.de/10005785968