In a mixed-model assembly line, varying models of the same basic product are to be produced in a facultative sequence. This results to a short-term planning problem where a sequence of models is sought which minimizes station overloads. In practice - e.g. the final assembly of cars - special...
Persistent link: https://www.econbiz.de/10005337428
Assembly line balancing problems (ALBPs) arise whenever an assembly line is configured, redesigned or adjusted. An ALBP consists of distributing the total workload for manufacturing products among the work stations along the line. On the one hand, research has focussed on developing effective...
Persistent link: https://www.econbiz.de/10005023390
Production processes in a wide range of industries rely on modern mixed-model assembly systems, which allow an efficient manufacture of various models of a common base product on the same assembly line. In order to facilitate a just-in-time supply of materials, the literature proposes various...
Persistent link: https://www.econbiz.de/10005253491
Almost ever since freight has been transported via rail, shunting yards (also called classification or marshaling yards) are operated in order to separate freight trains and reassemble new trains. The efficient use of shunting yards has a deep impact on the efficiency and reliability of rail...
Persistent link: https://www.econbiz.de/10010871127
In modern rail-rail transshipment yards huge gantry cranes spanning all railway tracks allow for an efficent transshipment of containers between different freight trains. This way, multiple trains loaded with cargo for varying destinations can be consolidated to a reduced number of homogeneous...
Persistent link: https://www.econbiz.de/10008633336
To enable rapid container transshipment between freight trains in modern rail-rail transshipment yards efficient computerized scheduling procedures are indispensable. This paper proposes a dynamic programming approach, which determines yard areas for gantry cranes, so that the workload is evenly...
Persistent link: https://www.econbiz.de/10009202169
To enable rapid container transshipment between freight trains in modern rail-rail transshipment yards efficient computerized scheduling procedures are indispensable. This paper proposes a dynamic programming approach, which determines yard areas for gantry cranes, so that the workload is evenly...
Persistent link: https://www.econbiz.de/10005665383
A mixed-model assembly line enables the joint production of dierent models of a common base product in intermixed model sequence (lot size one). Previous approaches for the short-term planning task of model sequencing either aim at minimizing work overload (mixed-model sequencing and car...
Persistent link: https://www.econbiz.de/10005785951
A mixed-model assembly line requires the solution of a short-term sequencing problem which decides on the succession of different models launched down the line. A famous solution approach stemming from the Toyota Production System is the so called Level Scheduling, which aims at distributing the...
Persistent link: https://www.econbiz.de/10005785957
At cross docking terminals, shipments from inbound trucks are unloaded, sorted and moved to dispatch points where they are directly loaded onto outbound trucks for an immediate delivery elsewhere in the distribution system. This warehouse management concept aims at realizing economies in...
Persistent link: https://www.econbiz.de/10005785961