//--> //--> //--> //-->
Toggle navigation
Logout
Change account settings
EN
DE
ES
FR
A-Z
Beta
About EconBiz
News
Thesaurus (STW)
Research Skills
Help
EN
DE
ES
FR
My account
Logout
Change account settings
Login
Publications
Events
Your search terms
Search
Retain my current filters
~source:"repec"
Search options
All Fields
Title
Exact title
Subject
Author
Institution
ISBN/ISSN
Published in...
Publisher
Open Access only
Advanced
Search history
My EconBiz
Favorites
Loans
Reservations
Fines
You are here:
Home
Significance of Quality Certif...
Similar by person
Narrow search
Delete all filters
| 1 applied filter
Year of publication
From:
To:
Subject
All
ACA
2
ACO algorithm
2
CMS
2
ELSP
2
ant colony algorithm
2
ant colony optimisation
2
cell formation
2
cellular manufacturing systems
2
costs
2
economic lot scheduling problem
2
genetic algorithms
2
grouping efficacy
2
lot sizing
2
machine cells
2
manufacturing cells
2
metaheuristics
2
part families
2
sequence-dependent setup times
2
sequence-independent setup times
2
simulated-annealing
2
time-varying lot sizes
2
India
1
OEMs
1
Pareto-optimal solutions
1
SCM
1
bottleneck assignment
1
branch-and-bound algorithm
1
customer satisfaction
1
industrial engineering
1
long-term relationships
1
lower bound
1
non-dominated solutions
1
original equipment manufacturers
1
performance measurement
1
permutation flow shops
1
supplier selection
1
suppliers
1
supply chain management
1
supply chain orientation
1
supply chain performance
1
more ...
less ...
Online availability
All
Undetermined
26
Type of publication
All
Article
28
Language
All
Undetermined
28
Author
All
Rajendran, Chandrasekharan
28
Ziegler, Hans
4
Brucker, P.
2
Chandrasekaran, C.
2
Chaudhuri, Dipak
2
Chetty, O.V. Krishnaiah
2
Daduna, J.
2
Gopalan, Ram
2
Hanumanna, Donakonda
2
Holthaus, Oliver
2
Marti, K.
2
Megala, N.
2
Daniel, J. Sudhir Ryan
1
Dath, T.N. Srikantha
1
Gajpal, Prem Prakash
1
Gajpal, Yuvraj
1
Ganesh, L. S.
1
Gangadharan, Rajesh
1
Gowrishankar, K.
1
Jayamohan, M. S.
1
Madhushini, N.
1
Narashiman, K.
1
Parthasarathy, Srinivasaraghavan
1
Raghu, T. S.
1
Sharadapriyadarshini, B.
1
Srinivasan, G.
1
Varadharajan, T.K.
1
more ...
less ...
Published in...
All
European Journal of Operational Research
12
International Journal of Production Economics
8
European Journal of Industrial Engineering
6
Computational Statistics
1
Mathematical Methods of Operations Research
1
Source
All
RePEc
OLC EcoSci
47
ECONIS (ZBW)
39
Other ZBW resources
16
Showing
1
-
10
of
28
Sort
relevance
articles prioritized
date (newest first)
date (oldest first)
1
Book reviews
Marti, K.
;
Rajendran, Chandrasekharan
;
Daduna, J.
; …
- In:
Computational Statistics
45
(
1997
)
1
,
pp. 161-166
Persistent link: https://www.econbiz.de/10010847471
Saved in:
2
Book reviews
Marti, K.
;
Rajendran, Chandrasekharan
;
Daduna, J.
; …
- In:
Mathematical Methods of Operations Research
45
(
1997
)
1
,
pp. 161-166
Persistent link: https://www.econbiz.de/10010949913
Saved in:
3
Heuristics for scheduling in flowshop with multiple objectives
Rajendran, Chandrasekharan
- In:
European Journal of Operational Research
82
(
1995
)
3
,
pp. 540-555
Persistent link: https://www.econbiz.de/10005236810
Saved in:
4
An ant-colony optimization algorithm for minimizing the completion-time variance of jobs in flowshops
Gajpal, Yuvraj
;
Rajendran, Chandrasekharan
- In:
International Journal of Production Economics
101
(
2006
)
2
,
pp. 259-272
Persistent link: https://www.econbiz.de/10005311858
Saved in:
5
Heuristic algorithm for scheduling in a flowshop to minimize total flowtime
Rajendran, Chandrasekharan
- In:
International Journal of Production Economics
29
(
1993
)
1
,
pp. 65-73
Persistent link: https://www.econbiz.de/10005311921
Saved in:
6
An experimental evaluation of heuristics for scheduling in a real-life flowshop with sequence-dependent setup times of jobs
Parthasarathy, Srinivasaraghavan
;
Rajendran, Chandrasekharan
- In:
International Journal of Production Economics
49
(
1997
)
3
,
pp. 255-263
Persistent link: https://www.econbiz.de/10005311926
Saved in:
7
An efficient dynamic dispatching rule for scheduling in a job shop
Raghu, T. S.
;
Rajendran, Chandrasekharan
- In:
International Journal of Production Economics
32
(
1993
)
3
,
pp. 301-313
Persistent link: https://www.econbiz.de/10005311927
Saved in:
8
Flow shop scheduling algorithms for minimizing the completion time variance and the sum of squares of completion time deviations from a common due date
Gowrishankar, K.
;
Rajendran, Chandrasekharan
;
Srinivasan, G.
- In:
European Journal of Operational Research
132
(
2001
)
3
,
pp. 643-665
Persistent link: https://www.econbiz.de/10005337543
Saved in:
9
Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times
Rajendran, Chandrasekharan
;
Ziegler, Hans
- In:
European Journal of Operational Research
149
(
2003
)
3
,
pp. 513-522
Persistent link: https://www.econbiz.de/10005337684
Saved in:
10
Heuristic approaches to determine base-stock levels in a serial supply chain with a single objective and with multiple objectives
Daniel, J. Sudhir Ryan
;
Rajendran, Chandrasekharan
- In:
European Journal of Operational Research
175
(
2006
)
1
,
pp. 566-592
Persistent link: https://www.econbiz.de/10005337695
Saved in:
1
2
3
Next
Last
Results per page
10
25
50
100
250
A service of the
zbw
×
Loading...
//-->