Showing 11 - 20 of 513
We consider coordination mechanisms for the distributed scheduling of n jobs on m parallel machines, where each agent holding a job selects a machine to process his/her own job. Without a central authority to construct a schedule, each agent acts selfishly to minimize his/her own disutility,...
Persistent link: https://www.econbiz.de/10010597602
This paper is concerned with the problem of maintaining open order due dates in job shops that plan and schedule their operations using Material Requirements Planning (MRP) methodology. Two different techniques for dealing with open order due date changes are analyzed using customer service...
Persistent link: https://www.econbiz.de/10009203949
The problem undertaken in this study is inspired from a real life application. Consider a vehicle routing problem where the distances between the customer locations are either one or two. We name this problem as VRP12 in an analogy for the name TSP12 used for the traveling salesman problem in...
Persistent link: https://www.econbiz.de/10010678879
Persistent link: https://www.econbiz.de/10008631317
In this paper, we consider the parallel machine scheduling with a simultaneity constraint and unit-length jobs. The problem can be described as follows. There are given m parallel machines and a graph G, whose vertices represent jobs. Simultaneity constraint means that we can process a vertex...
Persistent link: https://www.econbiz.de/10008763471
analysis of the OR rescheduling problem. We model this problem as an Integer Linear Program (ILP) which objective is to …
Persistent link: https://www.econbiz.de/10010865060
estimate the debt rescheduling probabilities of 15 Eastern European countries during the transition period from 1990 … and institutional and private foreign investors to investigate factors that influence debt rescheduling probabilities, as … good repayment record result in low debt rescheduling probabilities and, in turn, decrease the cost of debt for these …
Persistent link: https://www.econbiz.de/10010938625
Last train timetable rescheduling aims at coordinating the arrival and departure times of feeder trains with connecting … lines. In this paper, we propose a rescheduling model for last trains with the consideration of train delays caused by …
Persistent link: https://www.econbiz.de/10010939750
In this paper, we address the transporter scheduling problem of ship assembly block operations management, which can be transformed into parallel machine scheduling with sequence-dependent setup times and precedence constraints. The objective is to maximise the workload balance among...
Persistent link: https://www.econbiz.de/10010670132
During the past decades bananas were imported to Europe in reefer vessels. Often, these vessels returned to Central America empty. This resulted in high carbon emissions and high costs. Therefore, importers switched to reefer containers which are shipped to Europe by liner cargo services....
Persistent link: https://www.econbiz.de/10011263672