Showing 1 - 10 of 19
This work deals with the parallel machine scheduling problem which consists in the assignment of n jobs on m parallel machines. The most general variant of this problem is when the processing time depends on the machine to which each job is assigned to. This case is known as the unrelated...
Persistent link: https://www.econbiz.de/10008865267
The scheduling of flow shops with multiple parallel machines per stage, usually referred to as the hybrid flow shop (HFS), is a complex combinatorial problem encountered in many real world applications. Given its importance and complexity, the HFS problem has been intensively studied. This paper...
Persistent link: https://www.econbiz.de/10008551236
This paper deals with the development of customised and realistic manufacturing scheduling systems. More specifically, we focus onto a key element that may help driving their efficient design and implementation: i.e., the set of building blocks that should include a generic scheduling system and...
Persistent link: https://www.econbiz.de/10008551238
In this work three genetic algorithms are presented for the permutation flowshop scheduling problem with total tardiness minimisation criterion. The algorithms include advanced techniques like path relinking, local search and a procedure to control the diversity of the population. We also...
Persistent link: https://www.econbiz.de/10008521594
Persistent link: https://www.econbiz.de/10005151814
The well-known NEH heuristic from Nawaz, Enscore and Ham proposed in 1983 has been recognized as the highest performing method for the permutation flowshop scheduling problem under the makespan minimization criterion. This performance lead is maintained even today when compared against...
Persistent link: https://www.econbiz.de/10005445514
The flowshop scheduling problem (FSP) has been widely studied in the literature and many techniques for its solution have been proposed. Some authors have concluded that genetic algorithms are not suitable for this hard, combinatorial problem unless hybridization is used. This work proposes new...
Persistent link: https://www.econbiz.de/10005452895
In this work, we propose cooperative metaheuristic methods for the permutation flowshop scheduling problem considering two objectives separately: total tardiness and makespan. We use the island model where each island runs an instance of the algorithm and communications start when the islands...
Persistent link: https://www.econbiz.de/10005355111
In this work a genetic algorithm is presented for the unrelated parallel machine scheduling problem in which machine and job sequence dependent setup times are considered. The proposed genetic algorithm includes a fast local search and a local search enhanced crossover operator. Two versions of...
Persistent link: https://www.econbiz.de/10008865056
This paper considers the hybrid flexible flowline scheduling problem with a set of additional restrictions and generalizations that are common in practice. These include precedence constraints, sequence dependent setup times, time lags, machine eligibility and release times. There are many...
Persistent link: https://www.econbiz.de/10008865276