Showing 1 - 10 of 36
there exists a line plan at equilibrium, which minimizes the probability of delays of the transportation system. This result …
Persistent link: https://www.econbiz.de/10010987565
Almost everywhere public intervention in cultural heritage (CH) conservation is widespread. Using Italy as a case study, the paper analyses public capital expenditure for CH conservation and investigates whether the high degree of specialization of contracting authorities affects the efficiency...
Persistent link: https://www.econbiz.de/10010989662
In this paper, we build and structurally estimate a complete information bargaining model of collective negotiation for Spain. For large firms, the assumption of complete information seems a sensible one, and it matches the collective bargaining environment better than the one provided by...
Persistent link: https://www.econbiz.de/10010884535
delays are given. One has to schedule the jobs on a single machine such that all delays between consecutive jobs in a chain …
Persistent link: https://www.econbiz.de/10010999926
This report examines the current capacity of the EU’s airport infrastructure and highlights in a general way the main factors determining that capacity. In the report, the nature and the role of airport services are detailed and the multi-service networked industry that characterises airport...
Persistent link: https://www.econbiz.de/10011269238
negotiations ending without agreement, a common feature in the data. Delays in equilibrium are the result of uncertainty about the …
Persistent link: https://www.econbiz.de/10005371306
This paper considers the financial implications of the traffic congestion problem in the distribution of petroleum products in a Nigerian metropolis. Data relating to truck movements, their servicing costs and other parameters that are connected with traffic congestion are collected and analysed...
Persistent link: https://www.econbiz.de/10009352538
Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote...
Persistent link: https://www.econbiz.de/10009416557
stochastic reaction-diffusion Cohen–Grossberg neural networks with delays. By using the properties of M-cone and inequality … stochastic reaction-diffusion Cohen–Grossberg neural networks with delays. The sufficient conditions are easily checked in …
Persistent link: https://www.econbiz.de/10010751853
are here shown both in the absence and the presence of delays, introduced to simulate the handling time of the prey. In …
Persistent link: https://www.econbiz.de/10010751869