and tardiness costs, assuming that processing times follow normal distributions and due dates are decisions. We develop a …
Persistent link: https://www.econbiz.de/10010871245
In this paper we deal with the time complexity of single- and identical parallel-machine scheduling problems in which the durations and precedence constraints of the activities are stochastic. The stochastic precedence constraints are given by GERT networks. First, we sketch the basic concepts...
Persistent link: https://www.econbiz.de/10010999597
In this paper we deal with the time complexity of single- and identical parallel-machine scheduling problems in which the durations and precedence constraints of the activities are stochastic. The stochastic precedence constraints are given by GERT networks. First, we sketch the basic concepts...
Persistent link: https://www.econbiz.de/10010847547
We consider the problem of allocating a single server to a system of queues with Poisson arrivals. Each queue represents a class of jobs and possesses a holding cost rate, general service distribution, and general set-up time distribution. The objective is to minimize the expected holding cost...
Persistent link: https://www.econbiz.de/10009191619
We present polynomial-time algorithms for single machine problems with generalized positional deterioration effects and machine maintenance. The decisions should be taken regarding possible sequences of jobs and on the number of maintenance activities to be included into a schedule in order to...
Persistent link: https://www.econbiz.de/10010573957
function is the sum of penalties for job earliness, penalties for job tardiness, and penalties associated with the lead times …
Persistent link: https://www.econbiz.de/10009208855
The influence of applying queue state dependent order acceptance policies, where either decision is with customer or with manufacturer, on optimal capacity investment is discussed. Therefore, three order acceptance policies are developed where either the customer has a certain service level...
Persistent link: https://www.econbiz.de/10011209347
system. Our goal is to develop a job release schedule that not only minimizes tardiness but also maximizes flexibility. The … for tardiness and flow time "costs." We include a discussion of how the cost parameters of this objective function can be …
Persistent link: https://www.econbiz.de/10009208761
(Problem I) while the second uses the same objective subject to a constraint on average job tardiness (Problem II). We show …
Persistent link: https://www.econbiz.de/10009191273
of total completion time and total tardiness while in the second one, the objective is weighted sum of total completion …
Persistent link: https://www.econbiz.de/10009141311