A network needs to be constructed by a server (construction crew) that has a constant construction speed which is incomparably slower than the server’s travel speed within the already constructed part of the network. A vertex is recovered when it becomes connected to the depot by an already...
Persistent link: https://www.econbiz.de/10011264292
Persistent link: https://www.econbiz.de/10005329644
Reverse logistics problems arising in municipal waste management are both wide-ranging and varied. The usual collection system in UE countries is composed of two phases. First, citizens leave their refuse at special collection areas where different types of waste (glass, paper, plastic, organic...
Persistent link: https://www.econbiz.de/10005358085
The Time and Space constrained Assembly Line Balancing Problem (TSALBP) is a variant of the classical Simple Assembly Line Balancing Problem that additionally accounts for the space requirements of machinery and assembled parts. The present work proposes an adaptation of the Bounded Dynamic...
Persistent link: https://www.econbiz.de/10009018764
In this article, we present a new exact algorithm for solving the simple assembly line balancing problem given a determined cycle time (SALBP-1). The algorithm is a station-oriented bidirectional branch-and-bound procedure based on a new enumeration strategy that explores the feasible solutions...
Persistent link: https://www.econbiz.de/10011052608
The simple assembly line balancing problem is the simplification of a real problem associated to the assignment of the elementary tasks required for assembly of a product in an assembly line. This problem has been extensively studied in the literature for more than half a century. The present...