Showing 1 - 10 of 61
The class of neighbour games is the intersection of the class of assignment games (cf. Shapley and Shubik (1972)) and the class of component additive games (cf. Curiel et al. (1994)). For assignment games and component additive games there exist polynomially bounded algorithms or order p4 for...
Persistent link: https://www.econbiz.de/10005775427
The extended Chinese postman (CP) enterprize is induced by a connected and undirected graph G. A server is located at some fixed vertex of G, to be referred to as the post office. Each player resides in a single edge, and each edge contains at most one player. Thus, some of the edges can be...
Persistent link: https://www.econbiz.de/10005596278
Persistent link: https://www.econbiz.de/10005618550
Neighbour games arise from certain matching or sequencing situations in which only some specific pairs of players can obtain a positive gain. As a consequence, the class of neighbour games is the intersection of the class of assignment games (Shapley and Shubik (1972)) and the class of component...
Persistent link: https://www.econbiz.de/10005660467
Persistent link: https://www.econbiz.de/10005660519
Resource loading appears in many variants in tactical (mid-term) capacity planning in multi-project environments. It develops a rough sketch of the resource usage and timing of the work packages of a portfolio of orders. The orders need to be executed within a time horizon organized into...
Persistent link: https://www.econbiz.de/10011209304
Persistent link: https://www.econbiz.de/10005339638
Persistent link: https://www.econbiz.de/10005347619
Persistent link: https://www.econbiz.de/10005158429
In the last few decades, several effective algorithms for solving the resource-constrained project scheduling problem have been proposed. However, the challenging nature of this problem, summarised in its strongly NP-hard status, restricts the effectiveness of exact optimisation to relatively...
Persistent link: https://www.econbiz.de/10005464831