Showing 1 - 10 of 31
This paper deals with a scheduling problem of independent tasks with common due date where the objective is to minimize the total weighted tardiness. The problem is known to be ordinary NP-hard in the case of a single machine and a dynamic programming algorithm was presented in the seminal work...
Persistent link: https://www.econbiz.de/10008483363
Persistent link: https://www.econbiz.de/10005329743
Persistent link: https://www.econbiz.de/10005151590
Persistent link: https://www.econbiz.de/10005287552
This paper deals with due date assignment and just-in-time scheduling for single machine and parallel machine problems with equal-size jobs where the objective is to minimize the total weighted earliness-tardiness and due date cost. These two problems, but with a common due date to be...
Persistent link: https://www.econbiz.de/10008551230
This paper deals with the re-engineering and design optimization of a warehouse for package storage operations occurring daily at a leading courier express company in Italy. The objective of our study is to quantify the return on investment and error reduction that can be achieved by the...
Persistent link: https://www.econbiz.de/10010987564
This paper addresses a scheduling problem arising in the real time management of a metro rail terminus. It mainly consists in routing incoming trains through the station and scheduling their departures with the objective of optimizing punctuality and regularity of train service. The purpose of...
Persistent link: https://www.econbiz.de/10005347305
Persistent link: https://www.econbiz.de/10005151329
This paper addresses the problem of train conflict detection and resolution, which is dealt every day by traffic controllers to adapt the timetable to delays and other unpredictable events occurring in real-time. We describe a number of algorithmic improvements implemented in the real-time...
Persistent link: https://www.econbiz.de/10008474275
This paper addresses a practical scheduling problem arising in the packaging department of a pharmaceutical industrial plant. The problem is modeled as a multi-purpose machine scheduling problem with setup and removal times, release and due dates and additional constraints related to the scarce...
Persistent link: https://www.econbiz.de/10008483322