Showing 1 - 10 of 6,375
The effective and efficient use of resources in public project management requires a commitment to driving down costs and exploiting value opportunities. In achieving this, public management, being a civil service, must also be aware of social, political and ethical requirements that can impinge...
Persistent link: https://www.econbiz.de/10014800023
Purpose – Several types of pricing and payment systems are used in the construction industry. However, the current practice is failing to utilise the potential of a link between project performance and clients' satisfaction on one hand and stakeholders' cash flow on the other. Therefore, a...
Persistent link: https://www.econbiz.de/10014868860
Purpose – The purpose of this paper is to evaluate the perception of a contractor on early contractor involvement (ECI) type of construction project delivery approach in terms of its benefits and drawbacks. Design/methodology/approach – A questionnaire survey was conducted on various...
Persistent link: https://www.econbiz.de/10014677482
The effective integration of on‐the‐job development with off‐the‐job training does not happen often, but when it does the effects can be dramatic. To realise this strategy one company, Kingsway, recognised a need to make a major investment in the development of managerial talent. A bold...
Persistent link: https://www.econbiz.de/10014755705
Purpose – The purpose of this paper is to create a deeper understanding of the importance of monitoring key aspects of facility management (FM), right from the planning stage of a building's lifecycle. Design/methodology/approach – This paper is based on literature review and qualitative...
Persistent link: https://www.econbiz.de/10014851895
Argues, with evidence from a number of related studies, that in order to effectively manage quality in the construction project environment, firms need two things. First, externally orientated, flexible, quality improvement systems are required. Second, firms need a targeted approach to...
Persistent link: https://www.econbiz.de/10014800013
Utilizes approaches from systems analysis, quality management and previous empirical results to formulate the framework for the study. Took selected engineering consulting firms in Taiwan as research subjects for the empirical portion of the studies. The scope is restricted to the design phase...
Persistent link: https://www.econbiz.de/10014801006
Purpose – The purpose of this paper is to explore employees' perceptions of work‐life balance (WLB) in an Australian infrastructure construction project, using semi‐structured focus groups. Design/methodology/approach – In total, 43 employees participated in the focus groups,...
Persistent link: https://www.econbiz.de/10014786277
Purpose – Clients of the construction industry, an important segment of the project management (PM) discipline, can make an important contribution to the occupational health and safety (OHS) performance of the construction projects they procure. This practice note aims to describe an...
Persistent link: https://www.econbiz.de/10014786279
Purpose – The purpose of the paper is to study the influence of procurement on the performance of integrated design teams. Design/methodology/approach – The research paradigm is based on Russian socio‐constructivist approach to activity theory. Activity theory, as opposed to natural or...
Persistent link: https://www.econbiz.de/10014786296