Showing 1 - 1 of 1
Purpose – The purpose of this paper is to solve the problem of committing electric power generators (unit commitment, UC), considering network constraints. Design/methodology/approach – The UC is first solved with a local search based meta‐heuristic, following the assumption that all...
Persistent link: https://www.econbiz.de/10014773438