Showing 1 - 3 of 3
Persistent link: https://www.econbiz.de/10011921972
Persistent link: https://www.econbiz.de/10013368300
We study an original equipment manufacturer (OEM) purchasing two inputs for assembly from two suppliers with private cost information. The OEM can contract with the two suppliers either simultaneously or sequentially. We consider both cases in which the OEM has relatively equal bargaining power...
Persistent link: https://www.econbiz.de/10012850767