Showing 1 - 10 of 52
Persistent link: https://www.econbiz.de/10008701608
Persistent link: https://www.econbiz.de/10008991913
Persistent link: https://www.econbiz.de/10009126317
Purpose – The construction industry in Australia is characterised by a long work‐hours culture, with conditions that make it difficult for staff to balance their work and non‐work lives. The objective of this paper is to measure the success of a work‐place intervention designed to...
Persistent link: https://www.econbiz.de/10014786348
Purpose – The purpose of this paper is to provide a labour process theory interpretation of four case studies within the Australian construction industry. In each case study a working time intervention (a shift to a five‐day working week from the industry standard six days) was implemented...
Persistent link: https://www.econbiz.de/10014974177
Persistent link: https://www.econbiz.de/10003855987
Persistent link: https://www.econbiz.de/10009011679
Persistent link: https://www.econbiz.de/10003803919
Purpose – This mixed‐method study aims to determine the extent to which the career paths of senior managers conform with the traditional versus protean elements described in the careers literature and whether these paths vary by gender. Design/methodology/approach – A total of 15 senior...
Persistent link: https://www.econbiz.de/10014693390
Persistent link: https://www.econbiz.de/10011538614