Showing 1 - 7 of 7
,807,105. (2) Part II--Planning and Design--Project No. 1983-35-04, Contract No. 4035, $352,379 for Clearwater Coho Restoration …
Persistent link: https://www.econbiz.de/10009435380
Decisions throughout the life cycle of a building, from design through construction and commissioning to operation and …
Persistent link: https://www.econbiz.de/10009435712
equally vulnerable. Factors such as local generation costs, transmission constraints, market concentration, and market design …
Persistent link: https://www.econbiz.de/10009436144
The objective of this study is to assess the technical and economic impacts of siting direct two-stage coal liquefaction and indirect liquefaction, using slurry Fischer-Tropsch (F-T) reactors, at the same location. The incentives for this co-siting include the sharing of the large number of...
Persistent link: https://www.econbiz.de/10009436701
invention of new tools and techniques; the scientific analysis of complex situations; and the design, construction and operation …
Persistent link: https://www.econbiz.de/10009437172
orientation, shading, and other structural factors into account in the design of new homes. Building-integrated photovoltaics … in system design and installation. Finally, the ability to install PV as a standard feature in new developments - like …
Persistent link: https://www.econbiz.de/10009437184
equally vulnerable. Factors such as local generation costs, transmission constraints, market concentration, and market design …
Persistent link: https://www.econbiz.de/10009437369