Showing 1 - 6 of 6
Mechanical Design Report, No. 28b - Staffing Plans, No. 31b - Construction Plan, and No. 33b - Startup and Operation Plan. …
Persistent link: https://www.econbiz.de/10009435425
. In other words, a life-cycle cost model must be developed to simulate the energy-related building-design decisions that … design energy budget to account for the external costs associated with that energy consumption. One such factor, RIF …
Persistent link: https://www.econbiz.de/10009435495
-steel and inflated-bubble heliostat design concepts, developed by MDAC and GE, respectively, are described; a costing scenario …
Persistent link: https://www.econbiz.de/10009435662
conceptual design for a plant to wash 25mm x 0 raw coal fines at a need rate of 300 mtph was completed. This plant will receive …
Persistent link: https://www.econbiz.de/10009436421
The objective of this study is to assess the technical and economic impacts of siting direct two-stage coal liquefaction and indirect liquefaction, using slurry Fischer-Tropsch (F-T) reactors, at the same location. The incentives for this co-siting include the sharing of the large number of...
Persistent link: https://www.econbiz.de/10009436701
Both the Intelligent Transportation Systems (ITS) and National Information Infrastructure (NU) efforts have ambitious goals that are expected to improve the fundamental infrastructure, commerce, and society of the United States. Achieving these goals will require rapid development and deployment...
Persistent link: https://www.econbiz.de/10009437317