Showing 1 - 10 of 6,588
Persistent link: https://www.econbiz.de/10001254280
Persistent link: https://www.econbiz.de/10009160245
Persistent link: https://www.econbiz.de/10000762853
Persistent link: https://www.econbiz.de/10000714940
Persistent link: https://www.econbiz.de/10011888050
One of the key assumptions of timetabling algorithms is that a solution exists that meets the pre-specified constraints, like driving times, transfer constraints and headway constraints. If this assumption is satisfied, in most cases a timetable can be found rapidly. Nowadays, railways are being...
Persistent link: https://www.econbiz.de/10012929530
The locomotive scheduling problem (or the locomotive assignment problem) is to assign a consist (a set of locomotives) to each train in a pre-planned train schedule so as to provide them sufficient power to pull them from their origins to their destinations. Locomotive scheduling problems are...
Persistent link: https://www.econbiz.de/10014106622
Persistent link: https://www.econbiz.de/10000382521
Persistent link: https://www.econbiz.de/10001307011
Persistent link: https://www.econbiz.de/10011987522