Showing 1 - 4 of 4
Persistent link: https://www.econbiz.de/10011289828
Persistent link: https://www.econbiz.de/10009785289
We consider a decentralized supply chain consisting of a supplier and a retailer facing price- and lead-time-sensitive demand. The decision process is modelled by a Stackelberg game where the supplier, as a leader, determines the capacity and the wholesale price, and the retailer, as a follower,...
Persistent link: https://www.econbiz.de/10011263665
In this paper, we investigate the effect of remanufacturing on capacity and production decisions. Inspired by the situation for a specific car company, we analyze a two-period model with manufacturing in both periods and the option in the second period to remanufacture products that are...
Persistent link: https://www.econbiz.de/10011043204